ZLJ-3 Automatic high precision air filling controller ,automatically inflatable controller for film extrusion blowing machine
ZLJ-3 Automatic high precision air filling controller ,automatically inflatable controller for film blowing machine, film extruder
This product uses infrared sensors to detect , only the sensor mounted on the outside of the film , the film will be able to automatically detect the size . Because it is non-contact detection of thin films using size perennial work so difficult to damage, and high accuracy. And the built-in solenoid valve and the throttle valve ( flow control valve ) , the mounting operation is very simple. Is ideal for blown film industry , is the best choice for replacement .
Main features:
1 ,The controllerA throttle valve , no longer applied , through the adjustment of the throttle can be reduced fluctuations in size of the film before inflation , so as to ensure consistent film width . Such films is wider, bigger air flow adjustable , whereas adjustable smaller.
2 ,When the film is broken or less than the set value1MMSo when can automatically inflated ; if the film is not broken , then can quickly charge to the set value.
3 ,When inflation exceeds5Second is not sufficient to set value, then the automatic alarm to inform , indicating gas flow is too small or the film has been cut off .
4 ,OperatingPanelPneumatic control with manual twist .
5 ,A sensitivity indicator , can indicate low , normal and high ( LED flashes )3States.
6 ,The entire control circuit , throttle , solenoid valves are mounted within the instrument in the control , the operation is very simple and convenient.
7 ,Using infrared film on the radio way to detect the size of solved due to mechanical switch detects insufficient brought (BF-I complement wind controller is a mechanical switch ) .
8 ,The products imported MCU intelligent control , solved due to misuse film jitter generated inflation . The control more accurate.
Parameter specifications
Resolution | <0.05mm |
inflatable turn delay | 0.5 seconds |
the inflatable close the lag time | <0.1 |
the alarm to open the delay time | 3 seconds |
Stoma diameter | :0-3 mm adjustable |
the working pressure | 0.01-0 .8 Mpa |
the operating voltage | 220V /60Hz |
Total Power | 30W |
Installation :
1,Installation: good connection inlet and outlet pipe , plug the sensor and power plug , plug in the power .
2,Ling adjustment : Turn the power switch, power indicator will light up. In the sensor between the launch tube and the receiver tube without something blocking the case , look at the spirit level indicator to indicate the status and transferred to light so far. Without light, spiritual degree potentiometer to \"+\" for the direction of rotation ; blinks , spiritual degree potentiometer to the \" - \"direction of rotation .
3,Throttle adjustments. In general, for a small size film or normal production, the throttle should be adjusted to be smaller to reduce the size of the film before and after inflation volatility , improve control accuracy . Specifications for bigger films or tensioned membrane , the throttle should be adjusted to be larger , so that bubble quickly fill to desired size , in order to reduce waste generation . Adjusting the throttle in an appropriate , by measuring the size of the film after inflation to judge. Under normal circumstances , more than the difference between1Cm , it should adjust small throttle .In production10Cm below the small size film, the throttle should be close shut , otherwise the size of the film will produce large fluctuations , namely a large , some small . To prevent this phenomenon, the tensioned membrane , it can open the throttle slightly , and hold the inflatable key ; when after blowing a large bubble and release the inflatable splint extraordinary character key and throttle shut small. After a while , the film will return to set the size dimensions
We have more categories for you. lf you can't find the products you want above,just fill in the form and tell us whatproducts you want to import from China.