SQ2-D2A Semi-automatic beer keg cleaning machine keg washer |
It is an automatic machine to clean inside of beer kegs via using two cleaning heads. The kegs need to be located on the panel of keg washer manually, and then the whole cleaning process can be achieved automatic.
Our keg washer / Rinser can clean all sizes of stainless steel beer kegs, including 10 liter, 20 liter, 30 liter, 50 liter etc. Different style of keg spears are available for keg washer to suit. The capacity of our keg washer can be adjusted from 20 barrels to 120 barrels according to your specifications.
1. All parameters (time values) can be adjusted without stopping machine.
2. Twin-acting pneumatic valve with reliable quality and anti-high temperature characteristic.
3. Maximum straight-line design on main cleaning pipelines makes sure the powerful and thorough scouring.
4. Adoption of world top products as main accessories makes sure premium quality.
5. Brand of components: SIMENS, AIRTAC, Schneider, etc.
Commodity name: | Automatic Two-head Keg Washer / Rinser |
Dimension of working table: | 1200 mm × 450 mm |
Outside dimension: | 1000 mm × 1350 mm × 1900 mm |
Net weight: | 175kg |
Power Supply: | 380V/50HZ |
Capacity of washing: | 80-100 barrels for 20L size |
Cleaning heads: | 1 |
Automatic or Manual one: | Semi-automatic |
Total Power: | 14kw |
Pressure of CO2 source: | 0.4~0.6 Mpa |
Pressure of CO2 preloading valve: | 0.15~0.20 Mpa |
Pressure of steam inlet: | 0.2 Mpa |
Heating style: | Electric |
Customized: | Allowed |
1. How to get a quotation? Re: We usually quote within 12 hours after getting your valued inquiry. Please free to call us via phone at anytime if you need the price urgently.
2. Is possible to get a sample? Re: A small sample keg is available for us to provide, but the freight charges to be paid by your side.
3. How about the MOQ? Re: Usually one piece is allowed if you want to order, but we suggest the more quantity, the better price.
4. What about the delivery time for mass production? Re:kegs can be loaded within 25-35 days usually, and brewing equipment can be finished within 60-80 days.
5. How can we control the quality of your goods? Re: We have professional quality inspection teams to test each product one by one before the loading.
6. Can you produce the goods as per customized requirement? Re: of course, we focus on supplying OEM & ODM service for ten years.
7. What is your payment terms? Re: Usually we accept payment based on T/T and L/C, but if you still want a Credit card payment, it is okay. |
How To Contact Us
Please Click To "Send"!