Products
Search
Categories
Electronics Product Beauty / Personal Care Furniture / Building Materials Automotive Machinery Clothing Accessories Home Department Store International Logistic Service
Contact Supplier
To: Annie Fu

Sophisticated Technology Stainless Steel Electric Heating 2 Vessels Brewhouse

Product description

Sophisticated Technology Stainless Steel Electric Heating 2 Vessels Brewhouse

Product Description
brewhouse.jpg
Item nameSpecifications & Structure
MaterialAll stainless steel sus304 sanitary construction 100% TIG welded and sanitary polished with quality controls, inspection and pressure testing.
Capacity1bbl, 2bbl, 3bbl, 5bbl, 7bbl, 10bbl, 15bbl, 20bbl, 30bbl, 40bbl, 50bbl or bigger.
Brewhouse structure2 vessels, 3 vessels, 4 vessels or others as per customers' requirements.
Thickness of interior shell3mm
Thickness of exterior shell2mm
Working platformStainless steel 304 with stairs
Brewing heating styleBy Electrical, by steam, by gas fired
Fermentation systemWith fermenters, Bright beer tanks, Glycol tank, chiller etc.
Control systemSemi-automatic or automatic for options.
JacketYes
Insulation materialPU 80mm
PumpWith all sanitary pump with brand motors.
PartsCIP cleaning ball, pressure guage, thermometer, carbonating stone, and adjustable feet as well as all necessary accessories.
Installed partsPVRV, Cleaning ball, Thermometer, sample valve, PT100, Carbonating stone, all necessary pipe and valves etc.
CustomizedAccording to customer's requirement.
ModelRSI-BH
BrandRSI
.jpg

  1.jpg

 

2.jpg

3.jpg

 

Related Products

Company Information

 -_05.jpg

-_04.jpg

()-_05.jpg

Production Process

 ()-_07.jpg

 

Packaging Logistics

 ()-_08.jpg

 

 

Our Advantages

 -_07.jpg

 

Main Markets

 TIM20190827144841.png

 

FAQ

 

1. How to get a quotation?

Re: We usually quote within 12 hours after getting your valued inquiry. Please free to call us via phone at anytime if you need the price urgently.

 

2. Is possible to get a sample?

Re: A small sample keg is available for us to provide, but the freight charges to be paid by your side.

 

3. How about the MOQ?

Re: Usually one piece is allowed if you want to order, but we suggest the more quantity, the better price.

 

4. What about the delivery time for mass production?

Re:kegs can be loaded within 25-35 days usually, and brewing equipment can be finished within 60-80 days.

 

5. How can we control the quality of your goods?

Re: We have professional quality inspection teams to test each product one by one before the loading.

 

6. Can you produce the goods as per customized requirement?

Re: of course, we focus on supplying OEM & ODM service for ten years.

 

7. What is your payment terms?

Re: Usually we accept payment based on T/T and L/C, but if you still want a Credit card payment, it is okay. 

How To Contact Us
    Please Click To "Send"!

-_11.jpg

Electric Golf Cart
Inquiry