REMOTE CONTROL CRUDE OIL REFINERY PLANT ONLINE AUTO SAMPLING SYSTEM
Keywords:
Keywords:
1. Install the sample cylinder and connect the hose to bottom side of the cylinder. Open the needle valves at both ends of the cylinder.
2. Sampling
Turn the handle to the "PROCESS" position, allowing the sample to flow continuously into and fill the cylinder. Hold for a period of time to ensure representative sampling.
3. Off
Turn the handle to the "OFF" position. Close the needle valves at both ends of the cylinder.
4. Depressurization/vent
Turn the handle to the "VENT" position, connecting the sampling line with the vent line to depressurize and discharge the residual sample.
5. POWER OFF
Turn the handle to the "OFF" position and disconnect the hose. Remove the cylinder and connect the hose to the top quick connect to complete the sampling process.
Wanan Sample Cylinder is widely used on petroleum device, chemical device and so on, especially leak-proof sampling for toxic, harmful, flammable, explosive and some other dangerous gas or liquid with medium or low pressure, like residual oil hydrotreating unit, heavy oil catalytic cracking unit, gas fractionation unit and so on. Sample collected by Wanan sample cylinder is authentic, accurate, no residual liquid, no residual gas emissions, protecting operators from harmful media, meanwhile no harm to environment, and eliminating accident from flammable, explosive median during sampling.
Features:
♥ Body made of seamless tubing provides consistent wall thickness, size, and capacity.
♥ Smooth internal neck transition allows easy cleaning and eliminates trapped fluids.
♥ Cold-formed female NPT threads provide greater strength.
♥ Heavy-wall end connections provide strength and resist flaring.
♥ Full-penetration gas tungsten arc-weld construction provides leak-tight sample containment.
♥ Sizes from 40 to 3785 cm3 (1 gal)
♥ Working pressures up to 5000 psig (344 bar)
♥ 304, 316L stainless steel resists intergranular corrosion.
♥ 304L and 316L stainless steel double-ended cylinders are available with dual certification to DOT and TC requirements.
Ordering Information:
Please make a safe product selection. When selecting products, the total system design must be considered to ensure safe, trouble-free performance, founction, material compatibility, adequate ratings, proper installation, operation and maintenance are the responsibilities of the system designer and user.
From quote to delivery, detail support can be offered.
1.CAD drawing
2.P&ID
3.Component selection
4.Bill of material
5.Professional services such as bending and welding
6.Testing to guarantee the system
7.Professional packaging and delivery
Standard packing or as customer request.
Within 7 days if instock, or according to the Order QTY and we'll detail you the date of shipment.