Outdoor Price 6m Pvc Bubble Inflatable Resturant Geodesic Glamping Garden Party Camping House Hotel Transparent Igloo Tent
Item name |
Igloo Geodesic Dome Tent |
size |
customized(from 3m to 6m) |
Color |
customized |
Application |
accommodation |
Cover Material |
PVC building membrane |
Frame Material |
GB Q235 Steel |
Connector |
Strong hot-dip galvanized steel |
Wind load |
Max. 120km/h (can be reinforced) |
Snow load |
75kg/sqm |
Fabric Thickness |
0.83±0.02mm |
Tear Strength |
520-580N(DIN53363) |
Tensile Strength |
1000-3000N(DIN53354) |
Temperature Resistance |
-30℃ - +70℃ |
Life Span |
8-10 year |
Residential:
Swimming pools, playgrounds, patios, terraces, gardens, glass windows, car porch, car parking areas, outdoor entertaining areas, fish ponds, fountains, BBQ areas, houses in golf courses (prevent golf balls from hitting the glasses, roof, pool and act as privacy screen) etc.
Commercial:
Kindergartens, schools, day care centers, sport fields, golf clubs/courses, hotels, recreation clubs, car parking areas, fast food, restaurants, stalls, offices, warehouses, supermarkets, shops, boat display area, exhibitions, etc.
Q:Why do I need to know the use of tents and local climate?
To know the use of tent and local weather, I can provide you with advice better,and it is very useful for our designer's work.
Q:Can I put my logo on the tent?
Sure,We accept all the customized service.
Q:Whether your tent can be convenient to install and remove?
Our tent is very convenient to install and remove, and it could be flexible to use in a variety of occasions.
Q:About warranty
We offer 5 year warranty service,we shall repair or replace it as soon as possible.
Q:Do your tent is safe and solid?
YES,Our tents can resist wind 100KM/H,Absolutely safe and reliable.
Q:Why the production process takes 10 working days?
In order to ensure quality, all metal materials and fabrics are made by our factory, it takes a little time.
Q:Method of payment
TT,Western Union,Bank transfer,alibaba(5% fee),Paypal(5% fee)
Advance payment (total payment of 30): after signing the contract and receive this payment, we will arrange for customer equipment production.Balance (total amount of 70): after this payment must be completed before delivery to our bank account.
ent For Event