New high-quality new 50-liter stainless steel draft beer barrel pump delivery barrel |
DIN-standard: | Euro-standard: | US-standard: | JIS-standard: |
D20 (20L beer keg) | E20 (20L beer keg) | U20 (1/6bbl beer keg) | J10 (10L slim beer keg) |
D30 (30L beer keg) | E30 (30L beer keg) | U30 (1/4bbl beer keg) | J20 (20L slim beer keg) |
D50 (50L beer keg) | E50 (50L beer keg) | U60 (1/2bbl beer keg) | J22.9 (22.9L slim beer keg) |
Mini Keg & Mini growler: | |||
MK-2 (2L mini keg), MK-3.6 (3.6L mini keg), MK-5 (5L mini keg) | |||
MG-1 (1L mini growler), MG-2 (2L mini growler) |
Stainless Steel Beer Keg | Loading Qty | ||||||
Manufacturing Standard | Product Name | Capacity | External dimensions | Weight | 20'GP | 40'GP | 40'HQ |
Euro-standard | 20L Beer Keg | 20L | Dia395mmx285mm | 7.8KG±5% | 680 | 1360 | 1530 |
30L Beer Keg | 30L | Dia408mmx365mm | 9.4KG±5% | 480 | 960 | 1130 | |
50L Beer Keg | 50L | Dia408mmx532mm | 11.8KG±5% | 320 | 650 | 830 |
1. How to get a quotation? Re: We usually quote within 12 hours after getting your valued inquiry. Please free to call us via phone at anytime if you need the price urgently.
2. Is possible to get a sample? Re: A small sample keg is available for us to provide, but the freight charges to be paid by your side.
3. How about the MOQ? Re: Usually one piece is allowed if you want to order, but we suggest the more quantity, the better price.
4. What about the delivery time for mass production? Re:kegs can be loaded within 25-35 days usually, and brewing equipment can be finished within 60-80 days.
5. How can we control the quality of your goods? Re: We have professional quality inspection teams to test each product one by one before the loading.
6. Can you produce the goods as per customized requirement? Re: of course, we focus on supplying OEM & ODM service for ten years.
7. What is your payment terms? Re: Usually we accept payment based on T/T and L/C, but if you still want a Credit card payment, it is okay. |
How To Contact Us
Please Click To "Send"!