FiNDT-2000 fully-automatic transportation florescent penetrant testing inspection equipment
Other recommendations for your business
1.The application is a semi-automated FPI system designed for hydrophilic post emulsifiable penetrants depending on the parts to be inspected and had a high throughput requirement. The process consists of seven steps-Penetrant,Dwell,Water Pre Rinse, Emulsifier,Water Post Rinse.Hot Air Dry and developer. The overall system processes a complete family of blades and vanes used for aerospace and is constructed from stainless steel.
2. The line runs left to right and is divided into two major sections. All post penetrant stages included roller conveyors for easy transfer without having to lift. Both are self contained on a base and includes a U shaped automatic staging conveyor. The conveyor holds eleven baskes and indexes approximately every 150 seconds.
2. The line runs left to right and is divided into two major sections. All post penetrant stages included roller conveyors for easy transfer without having to lift. Both are self contained on a base and includes a U shaped automatic staging conveyor. The conveyor holds eleven baskes and indexes approximately every 150 seconds.
Supplier's popular products
Contact Supplier
We have more categories for you. lf you can't find the products you want above,just fill in the form and tell us whatproducts you want to import from China.