Products
Search
Categories
Electronics Product Beauty / Personal Care Furniture / Building Materials Automotive Machinery Clothing Accessories Home Department Store International Logistic Service
Contact Supplier
To: Annie Fu

Commercial Brewery 4 vessels Brewhouse brewing equipment with Automatic control system

Product description

Commercial Brewery 4 vessels Brewhouse brewing equipment with Automatic control system

Product Description
brewhouse.jpg
Item name Specifications & Structure
Material All stainless steel sus304 sanitary construction 100% TIG welded and sanitary polished with quality controls, inspection and pressure testing.
Capacity 1bbl, 2bbl, 3bbl, 5bbl, 7bbl, 10bbl, 15bbl, 20bbl, 30bbl, 40bbl, 50bbl or bigger.
Brewhouse structure 2 vessels, 3 vessels, 4 vessels or others as per customers' requirements.
Thickness of interior shell 3mm
Thickness of exterior shell 2mm
Working platform Stainless steel 304 with stairs
Brewing heating style By Electrical, by steam, by gas fired
Fermentation system With fermenters, Bright beer tanks, Glycol tank, chiller etc.
Control system Semi-automatic or automatic for options.
Jacket Yes
Insulation material PU 80mm
Pump With all sanitary pump with brand motors.
Parts CIP cleaning ball, pressure guage, thermometer, carbonating stone, and adjustable feet as well as all necessary accessories.
Installed parts PVRV, Cleaning ball, Thermometer, sample valve, PT100, Carbonating stone, all necessary pipe and valves etc.
Customized According to customer's requirement.
Model RSI-BH
Brand RSI
.jpg

 1.jpg

 

2.jpg

3.jpg

 

 - RSI .jpg

Company Information

 -_05.jpg

-_04.jpg

()-_05.jpg

Production Process

 ()-_07.jpg

 

Packaging Logistics

 ()-_08.jpg

 

 

Our Advantages

 -_07.jpg

 

Main Markets

 TIM20190827144841.png

 

FAQ

 

1. How to get a quotation?

Re: We usually quote within 12 hours after getting your valued inquiry. Please free to call us via phone at anytime if you need the price urgently.

 

2. Is possible to get a sample?

Re: A small sample keg is available for us to provide, but the freight charges to be paid by your side.

 

3. How about the MOQ?

Re: Usually one piece is allowed if you want to order, but we suggest the more quantity, the better price.

 

4. What about the delivery time for mass production?

Re:kegs can be loaded within 25-35 days usually, and brewing equipment can be finished within 60-80 days.

 

5. How can we control the quality of your goods?

Re: We have professional quality inspection teams to test each product one by one before the loading.

 

6. Can you produce the goods as per customized requirement?

Re: of course, we focus on supplying OEM & ODM service for ten years.

 

7. What is your payment terms?

Re: Usually we accept payment based on T/T and L/C, but if you still want a Credit card payment, it is okay. 

How To Contact Us
    Please Click To "Send"!

-_11.jpg

Electric Golf Cart
Inquiry