Products
Search
Categories
Electronics Product Beauty / Personal Care Furniture / Building Materials Automotive Machinery Clothing Accessories Home Department Store International Logistic Service
Contact Supplier
To: Annie Fu

Commercial Automatic 2 heads 4 headsBeer Keg Washing Machine for beer brewery

Product description

Commercial Automatic 2 heads 4 headsBeer Keg Washing Machine for beer brewery

Product Description

 

 Beer filling  capping machine

 

 

Technical Parameter
Commodity name High quality Six-Head Semi-automatic Cans filling & capping 2 in 1 machine
Dimension of working table 2150 mm × 550mm
Outside dimension

2150mm×550mm×1900mm

Net weight 345kg.
Power Supply 380V/50HZ/3P or customized
Capacity of washing 360-450cans/hour (330ml)
Filling Heads 6
Automatic or Manual one Semi-Automatic
Total Power 1kw
Pressure of CO2 source 0.4~0.6 Mpa
Pressure of steam inlet 0.15~0.20 Mpa
Heating style By Electric or Steam
Customized Allowed

 

Simple Descriptions

 

1. Suit for fill 330ml, 500ml or bigger capacity cans.

2. Available to customized the machine with 4 - 10 heads.

3. Amount of filling.

4. With CIP unit.

Customized  Design

UL certificate is available for all electric components (around $1050 higher than CE certificate usually.)

 

 

Beer filling  capping machine

 

Beer filling  capping machine

 

 

Related Products

Company Information

Beer filling  capping machine

Beer filling  capping machine

Our Advantages

Beer filling  capping machine 

Beer filling  capping machine

 

Production Process

Beer filling  capping machine 

Packaging & Shipping

Beer filling  capping machine

 

FAQ

1. How to get a quotation?

Re: We usually quote within 12 hours after getting your valued inquiry. Please free to call us via phone at anytime if you need the price urgently.

 2. Is possible to get a sample?

Re: A small sample keg is available for us to provide, but the freight charges to be paid by your side.

 3. How about the MOQ?

Re: Usually one piece is allowed if you want to order, but we suggest the more quantity, the better price.

 4. What about the delivery time for mass production?

Re:kegs can be loaded within 25-35 days usually, and brewing equipment can be finished within 60-80 days.

 5. How can we control the quality of your goods?

Re: We have professional quality inspection teams to test each product one by one before the loading.

 6. Can you produce the goods as per customized requirement?

Re: of course, we focus on supplying OEM & ODM service for ten years.

 7. What is your payment terms?

Re: Usually we accept payment based on T/T and L/C, but if you still want a Credit card payment, it is okay. 

 

How To Contact Us
    Please Click To "Send"!

Beer filling  capping machine

Electric Golf Cart
Inquiry