Features:
1.Stainless steel automatic, semi-automatic pumping vacuum packing machine, advanced control system, selection of imported electrical accessories, the quality of the vacuum pump, the performance is very stable.
2.According to customer requirements, this machine can be customized to the L-type sealing [side sealing front seal].
3.VM-1200 pneumatic Kai cover vacuum packaging machine is specially designed for the large-sized items, vacuum packaging machine is automatically activated cover, Kai cover Angle, operating space.
4.Sealing bar heating means on the home address of the safe operation of the electric heating system in a wet environment, the VM-800A pneumatic decapper of the body of the vacuum packaging machine, the vacuum chamber and the metal portions of the vacuum cover by304 stainless steel material.
Specification
Model | VM-800S/VM-800L | VM-1200 |
Machine size | 945 × 750 × 1050mm | 1370 × 750 × 1050mm |
Size of vacuum chamber | 800 × 560 × (100) × 200mm | 1200 × 6000 × (150) × 200mm |
Sealing size | 800 ×10mm /480*800*10mm | 1250 ×10mm |
Vacuum pump | 45 m3/h | 100 m3/h |
Motor Power | 1.1KW | 3.1 KW |
Supply voltage | 380/415V | 380/415V |
Operating frequency | 50/60HZ | 50/60 HZ |
Duty cycle | 1-2times/min | 1-2times/min |
GW | 255KG | 473KG |
Net weight | 212KG | 230KG |
Meas | 1025 × 830 × 1235mm | 1550 × 830 × 1235mm |
Detail image
Other Product
Packaging:
Machine packing inside is plastic films and outside is fumigation wooden case.Our wooden case is very strong,it can bear long time shipping on the sea.And machine with preservative film,it can stop the salt sea water enter into the machine and make the machine corrosion.
Shipping:
Upon receipt of payment , delivery date will be in 3-15days
By Air, by Sea or by Express (DHL etc)
Shipment cost will depend on the destination, shipment way,size and the weight of the goods.
Q1:Are you factory or trading company?
A: We are factory and manufacture.
Q2: Where is your factory located? How can I visit your factory?
A: We are located in Shanghai, you can fly to Shanghai Hongqiao airport or Pudong airport. We can pick you up from the airport or your hotel.
Welcome to visit us!
Q3:How to place my order?
A: Just contact us via Trader Manager, E-mail, Skype or telephone to confirm the product, make the deposit then we will start to manufacture.
Q4 : What is the payment term?
A: 30% T/T deposit and 70% T/T balance payment before shipping.
Q5:How long is the delivery time?
A: About 7-15working days.